Pavement Marking Projects Scheduled This Weekend

The City of Mt. Pleasant will begin pavement marking projects on Friday, September 11 and continue through Monday, September 14. Crews will be refreshing pavement markings in Island Park, downtown parking lots, and along several city streets during the project period.

Parking Lot Pavement Marking

Work will begin Friday in Island Park, starting with the parking lot near the pickleball courts before moving through the remaining park parking areas. Crews will then prioritize Downtown Parking Lot 2 so it can reopen ahead of the Farmers Market on Saturday afternoon.

Depending on crew availability, multiple locations may be completed simultaneously.

The following parking lots are scheduled for pavement marking:

  • All Island Park parking lots
  •  Lot 1
  • Lot 2
  • Lot 6
  • Lot 7
  • Lot 8
  • Lot 12

Please avoid parking in these areas while crews are working and follow all posted signs and temporary closures.

Roadway Marking Work

From Saturday through Monday, additional crews will be completing hand-applied pavement markings, including directional arrows, crosswalks, and other roadway markings.

Roadway marking work is scheduled for the following road segments:

  • Adams Street: High Street to Broadway Street
  • Bellows Street: Mission Street to Isabella Road
  • Bradley Street: High Street to Pickard Street
  • Brown Street: Pickard Street to Broadway Street
  • Pickard Street: Bradley Street to Mission Street
  • West Campus Drive: Preston Street to Bellows Street

Please use caution when traveling through active work areas and be alert for workers and equipment. We appreciate your patience as this work helps maintain safe and clearly marked roadways and parking areas throughout Mt. Pleasant.

Temporary Closure Planned for Broadway Street

UPDATE (July 23): The planned Broadway Street closure and concrete pour scheduled for July 24 have been postponed. The work is now expected to occur early next week. Updated information will be shared once the new date is confirmed.


As improvements at City Hall continue to move forward, the planned closure of Broadway Street between Washington and Oak streets has been postponed. The closure was originally scheduled to allow crews to safely pour concrete for the retaining wall on the east side of the building, but that work has been rescheduled and is now expected to take place early next week.

Updated information regarding the closure date, detour route, and any traffic impacts will be shared as soon as the schedule is confirmed.

The City Hall entrance will remain open and accessible during normal business hours. Motorists, pedestrians, and visitors are encouraged to use caution when traveling through the area and to remain alert for construction workers, equipment, and changing traffic patterns.

We appreciate the community’s patience and cooperation as these improvements continue. Following posted signage and allowing extra travel time near City Hall will help keep everyone safe during ongoing construction activities.

Scheduled Road Closures on Broadway and Mosher Streets (May 26 – June 26)

UPDATE 6/11/2026

Paving on Broadway Street and Mosher Street is scheduled for Monday, June 15 and Tuesday, June 16, weather permitting.

Pavement markings are planned for Thursday, June 18. Both roads will remain closed to thru traffic and access will be limited during paving.

Closures remain in place:

  • Broadway St from Lansing St east to the City limits
  • Mosher St from Fancher St to Mission St

Road improvement work is scheduled on Broadway Street and Mosher Street from May 26 through June 26, 2026.

Beginning May 26, the following road closures will be in place:

  • Broadway St from Lansing St east to the City limits
  • Mosher St from Fancher St to Mission St

Please follow posted detours using High Street and allow extra travel time when traveling through the area.

Thank you for your patience as these improvements are completed.

Illinois Street Improvement Project to Begin June 6

The Illinois Street reconstruction project will begin on Monday, June 6 and continue through Saturday, August 13, 2022. Illinois Street and sidewalks will be closed from Fancher to Main Street. Illinois Street will only be open to local traffic, no through traffic will be permitted.

This project includes the removal and replacement of existing asphalt, road base, curb, sidewalk and handicap access ramps. Storm sewer installation will be completed in some areas. New streetscape will be installed between and Main and Franklin, and pedestrian lighting will be added to the north side of Illinois Street between Main and Fancher.